DCR files for liscence to install floating walkway, hydro-raking at Hammond Pond

Screen shot 2011-11-01 at 9.47.57 PM

The Massachussetts Department of Conservation and Recreation has filed with the Waterways Regulation Program for a liscence to (1) install a floating walkway on Hammond Pond and (2) perform hydro raking of aquatic vegetation in the pond.

View the liscence notification and more information here: Publc Notice of Waterways Liscense Application No. w14-4074


Posted

in

, ,

by

Tags:

Comments

One response to “DCR files for liscence to install floating walkway, hydro-raking at Hammond Pond”

  1. vonkohorn Avatar

    This seems like a bad idea. I really hope they don’t proceed with this plan.

Leave a Reply

Your email address will not be published. Required fields are marked *